Salsbury-industries 4350 Mail Chests Bolt Mounted Pedestal User Manual

Browse online or download User Manual for Furniture Salsbury-industries 4350 Mail Chests Bolt Mounted Pedestal. Salsbury Industries 4350 Mail Chests Bolt Mounted Pedestal User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 1
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
SALSBURY INDUSTRIES
1010 East 62
nd
Street, Los Angeles, CA 90001-1598
Phone: 1-800-624-5269 Int’l Phone: 323-846-6700
Fax: 1-800-624-5299 Int’l Fax: 323-846-6800
www.mailboxes.com engineering
@mailboxes.com
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.
Copyright © 2011 Salsbury Industries. All rights reserved. (Rev. 04, 11/1/11)
Mail Chests – 4350
Bolt Mounted Pedestal Installation Instructions
U.S.P.S. APPROVED
Installing the Bolt Mounted Pedestal
When you install a curbside or roadside mailbox, make sure that it is
easily accessible to the mail carrier. By regulation a locked mailbox
should be 41” to 45” from the ground or street surface up to the point
of mail entry. The door should be set back 6” to 8” back from the
front face of the curb or the road edge. However, you should check
with your local postmaster to ensure that the mailbox is installed
according to local regulations. It is important to note that it is not the
responsibility of mail carriers to open mailboxes that are locked,
accept keys for this purpose, or lock mailboxes after delivery of the
mail.
To install the bolt mounted pedestal, begin by digging a hole for the
concrete footing and then prepare the concrete. The top surface of
the footing should be about 12” by 18”. See the illustration for the
relative position of the rectangular footing to the pedestal and
mailbox. The concrete should extend into the ground 24” or greater if
your local frost line is deeper. Installing the concrete below the frost
line will prevent movement during ground freezing and thawing. The
bottom of the hole for the concrete footing should be filled with a
depth of about 6” of gravel to promote drainage under the post. The
top of the footing should be sloped for water runoff.
When digging the hole for the footing, be careful to not puncture
water, sewer, or gas lines.
Hardware for attaching the pedestal to the concrete footing is not
included. J-bolts are shown in the illustration as an example. The
concrete footing should include reinforcing steel and four (4) 1/2”
anchor studs protruding at least 1” above the concrete surface.
Place the anchor studs in a 4” x 10” pattern in the concrete to align
with the holes in the pedestal base.
When the concrete has cured sufficiently, install four (4) leveling nuts
on the anchor studs. Set the pedestal on the leveling nuts with the
four (4) anchor studs protruding through the holes in the pedestal
base plate. Adjust the leveling nuts to square up the pedestal.
Install four (4) nuts and washers on the anchor studs and tighten
securely.
CONCRETE
ANCHORS
NOT
INCLUDED
Page view 0
1

Summary of Contents

Page 1 - Mail Chests – 4350

SALSBURY INDUSTRIES 1010 East 62nd Street, Los Angeles, CA 90001-1598 Phone: 1-800-624-5269 Int’l Phone: 323-846-6700 Fax: 1-800-624-5299

Comments to this Manuals

No comments