Salsbury Industries 4955ALM Installation Guide

Browse online or download Installation Guide for Unknown Salsbury Industries 4955ALM. Salsbury Industries 4955ALM Installation Guide User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 1
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Parcel Drop – 4955
Installation Instructions
With a rugged all aluminum construction, Salsbury’s 4955 parcel
drop will provide years of maintenance free service.
Notes
1. Wall opening and lumber frame must be square.
2. Parcel drops should be shielded from direct weather conditions.
3. Hardware is not included to install units into rough opening.
4. Customer to supply parcel receiving receptacle for parcel drop.
Installation Instructions
1. It is recommended that the parcel drop be unpacked and reviewed
before construction of the rough opening and support framing. The
parcel drop is shipped fully assembled.
2. Using standard construction framing methods, frame wall
according to the rough opening dimensions provided. The unit is
designed to fit between studs on 16” centers.
3. Place unit in rough opening and securely fasten to the support
framing with screws through the holes provided.
Caution: Do not deform, force, or twist the frame to fit an
incorrect rough opening or against an irregular surface, as this
will affect the alignment of the assembly.
SALSBURY INDUSTRIES
1010 East 62
nd
Street, Los Angeles, CA 90001-1598
Phone: 1-800-624-5269 Int’l Phone: 323-846-6700
Fax: 1-800-624-5299 Int’l Fax: 323-846-6800
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.
Copyright © 2006 Salsbury Industries. All rights reserved.
Page view 0
1

Summary of Contents

Page 1 - Parcel Drop – 4955

Parcel Drop – 4955 Installation Instructions With a rugged all aluminum construction, Salsbury’s 4955 parcel d

Comments to this Manuals

No comments